Here’s a detailed RFP template to use when contacting manufacturers or suppliers:
REQUEST FOR PROPOSAL (RFP)
Project Title: Design, Manufacture, and Installation of Crude Oil Storage Tanks
1. Project Overview
Objective:
To procure [type of tank] storage tanks with a capacity of [specific capacity, e.g., 100,000 barrels] for [location and purpose, e.g., crude oil storage at a refinery terminal].
Scope:
The project includes design, fabrication, delivery, on-site assembly, and commissioning of crude oil storage tanks that comply with [specific standards, e.g., API 650].
Project Timeline:
Proposals must be submitted by [submission date]. The project is expected to commence by [start date] and be completed by [completion date].
2. Technical Requirements
- Tank Specifications:
- Type: [Fixed Roof, Floating Roof, or Other].
- Material: [Carbon Steel, Stainless Steel, or Alloy].
- Capacity: [e.g., 100,000 barrels].
- Dimensions: [Diameter and height, if known].
- Corrosion Protection: Specify coatings or liners required.
- Features and Accessories:
- Vapor recovery system.
- Firefighting systems (foam/water spray).
- Leak detection sensors.
- Remote monitoring equipment (temperature, pressure, level).
- Pressure-relief valves and vents.
- Environmental Compliance:
- Secondary containment (e.g., berms).
- VOC emission reduction systems.
- Standards Compliance:
- API 650 / API 653.
- [Other regional or national standards, e.g., GB (China), EU Directives].
3. Vendor Requirements
- Experience:
- Provide case studies or references for similar projects.
- Certifications:
- Proof of compliance with ISO 9001 or other relevant standards.
- Manufacturing and Assembly:
- Capability to fabricate tanks at scale.
- On-site assembly and testing expertise.
- Delivery Schedule:
- Detailed timeline from design to commissioning.
- Warranty and Maintenance:
- Specify warranty terms and post-installation support.
4. Proposal Submission Details
- Required Documents:
- Technical proposal, including design specifications and methodology.
- Financial proposal, itemized by components (fabrication, transport, installation).
- Certifications and credentials.
- Submission Deadline:
- [Date and time].
- Contact Information:
- [Name, email, phone number, and address].
- Evaluation Criteria:
- Technical feasibility (40%).
- Cost competitiveness (30%).
- Delivery timeline (20%).
- Past performance and references (10%).