How to install JZS drilling fluid shale shaker

2014-03-05 11:22:30

Our company offers JZS drilling fluid shale shaker and other equipment. We have a perfect after-sales service and technical support. When installing JZS drilling fluid shale shaker, you should follow these steps:
1, Remove the transport support. Since the base and the screen frame screen machines are connected by a spring, so when transported by transport firm support on the screening machine half. After entering the installation site should be taken down transportation support. Non-transport support is not taking the test machine.
JZS drilling fluid shale shaker
2, When installing JZS drilling fluid shale shaker, you should sieve unit on the basis of the level. In the case of not laying the foundation should be laid between the table and the base anti-vibration rubber sheet.
3, The vibration motor and cables inside the sieve experiencing severe vibration, the safety standards should be connected to ground.


Pre: How to choose a suitable drilling fluid shale shaker
Next: Drilling mud tanks is compact, small footprint, better grit removal effect
Hot Products
LNG Station Equipment

There are two different types of LNG sta

CNG Pressure Reducing Station

There are two different types of CNG Pre

Pressure control system

Pressure control system in the gas trans

Gas Pressure Reducing System

petroleum and natural gas treatment devi

Need Help?

or E-mail us:
huangwei@hawein.com
Follow Us